Production & Drilling Equipment
- Single Point Procurement of all spare parts and materials
- Conductor, Casing and Tubing
- Subsea BOP Stacks and Riser Equipment Well Heads and Christmas Trees
- Subsea Production Trees and Associated Equipment
- Control Systems for Subsea Trees and BOP's
- Complete or part BOP Annular Wellhead.
ITECO have available from stock:
- Q6 complete 18 3/4" (5"x2") x 5000psi Cameron Subsea Christmas Trees, together with all the ancillary installation equipment:
- Completion Riser
- Surface Test tree
- Work over Control System, complete
- Subsea Television System, complete



